Apartment property (5+ units)
Purchase, refinance, bridge or stabilization where property income supports the request.
- ✓ Current rent roll and leases
- ✓ Trailing operating statement
- ✓ Unit count, occupancy and planned work
Commercial, rental, construction, and alternative mortgage files in Richmond Hill are shaped by the property, the financing purpose, and the exit.
Province-wide service from our licensed Ontario brokerage. Open Financial does not maintain a local office in Richmond Hill.
The short version
Richmond Hill has large family homes, condominium corridors and properties being adapted for extended-family living. A high household income or valuable home can still produce a weak application when occupancy and income are described vaguely.
We would show who lives in the property, what each borrower earns and whether any additional unit is existing, proposed or informal. That keeps family support from being presented as rent and future plans from being presented as current value.
Choose the file you actually have
Purchase, refinance, bridge or stabilization where property income supports the request.
Commercial real estate occupied or acquired by the operating business.
Land, infill, conversion or construction where timing and the next financing stage matter.
Start here
Richmond Hill identifies City, York Region, education, and possible area-specific development charges. Amounts depend on location, type, size, by-law, and current indexing.
Ask for a full current estimate rather than using the City rate alone. Area-specific and Regional amounts can materially change required equity and the funds needed at permit or occupancy.
[1] Development chargesThe City explains that residential development charges are calculated and paid under rules that can defer payment from building permit to occupancy. Interest and the applicable calculation date can still affect the final amount.
Deferral improves early cash flow but does not remove the liability. The construction model should reserve the amount at occupancy so it does not consume lease-up or take-out proceeds unexpectedly.
[1] Development chargesRichmond Hill regulates placing or removing fill, grading, drainage changes, and related site alteration. Permit requirements and exemptions depend on the work and property.
Large landscaping, excavation, or infill work can add engineering, securities, and schedule risk. Confirm the permit before finalizing site-work cost or assuming the first draw can begin.
[2] Site alteration permitsA simple example
Illustrative only: a borrower owns a Richmond Hill lot and seeks a construction loan for a replacement home. The architectural budget is detailed, but excavation, retaining, drainage, and site-alteration costs are only allowances.
The lender receives the site-alteration path, civil or grading drawings, securities, charge schedule, fixed trade work, and contingency. Draws are tied to verified progress. Occupancy-stage charges are reserved instead of left for the permanent refinance to absorb.
This is an invented example that explains the review. It is not a client result, quote, approval, appraisal, rate, or expected outcome.
A little local context
202,022
people lived in Richmond Hill in the 2021 Census.
Richmond Hill is strongly owner-occupied and detached-home oriented. On a specific application, clarity around household structure and legal use matters more than that broad profile.
Statistics Canada counted 69,314 occupied private homes. These figures are background, not current prices, a forecast, or evidence for one appraisal.
[4] Statistics Canada 2021 Census ProfileWhat to send us
You do not need a perfect package to start. An address or listing and a plain explanation are useful.
The property address, listing, or a short description
The purchase price or value, amount needed, purpose, and timing
Choose an income program before assembling salary, dividends, business financials, or bank statements.
Document occupancy, leases, legal units, condo status, and property condition early.
Compare refinance, second-mortgage, and commercial structures on total cost and flexibility.
Local questions
These are general answers. The municipality and lender still need to confirm the actual property and transaction.
The City identifies municipal, York Region, education, and possible area-specific charges. Location, use, size, timing, and exemptions determine the total, so obtain a current project calculation.
It changes timing, not necessarily cost. Interest and current rate rules may apply, and the amount still needs a committed source at occupancy. Model it before sizing the take-out.
When work changes grades, drainage, fill, excavation, or related site conditions. The permit, engineering, securities, and timing can affect construction cost and when lender advances are usable.
No. A lender advances under its approved loan, cost-to-complete tests, and draw conditions. Extra value does not guarantee more proceeds. A real contingency and borrower overrun capacity are still required.
Provide legal unit status, leases, deposits, rent receipts, expenses, property tax, insurance, condition, and any planned work. Proposed rent increases or future units should be separated from current income and tested under lender policy.
Local references
Research checked August 27, 2026. Municipal information changes, so confirm it for the property before relying on it. Reviewed for Open Financial by Principal Broker: Marcel Greaux, Lic. M10002478.
Start with the property
The intake carries the city, property purpose and timing into the broker review. It is an enquiry, not an application or commitment to lend.
Garrison Capital Corp., operating as Open Financial | FSRA Mortgage Brokerage Licence #13362. Information is general and location-aware, but it is not legal, planning, appraisal, tax, or mortgage advice and does not guarantee approval, proceeds, pricing, timing, or funding.